Test of modified sequence of bomb release in B-29 aircraft. Report No. 1o(122), USSBS Index Section 2
- Owner Organization
Test of bomb, fragmentation 100-pound T-13. Report No. 1o(86), USSBS Index Section 2
Project No. 4474C471.6--11 June 1945--preliminary report on test of "tall boy" bomb in B-29 aircraft. Report No. 2-a(51), USSBS Index Section 6
Test of cluster, bomb, fragmentation T-4, E-4. Report No. 1o(82), USSBS Index Section 2
Test of bomb, incendiary, 500-pound, tail ejection E-16. Report No. 1o(48), USSBS Index Section 2
Project No. (M-1) 10d--23 July 1944--preliminary report of B-29 heat test (part of B-29 operational suitability test). Report No. 2-a(13), USSBS Index Section 6
Final report on test of bomb(butterfly) clusters, T-10 and T-11. Report No. 1o(49), USSBS Index Section 2
Project No. 2784C452.1--7 April 1945--test of bombing equipment installed in B-29 type aircraft. Report No. 2-a(42), USSBS Index Section 6
Project No. 4017C452.1--23 May 1945--cold weather test of B-29 type aircraft. Report No. 2-a(52), USSBS Index Section 6
Project No. 8839C413.44--1 January 1945--test of radar set AN/APG-15 in B-29 aircraft. Report No. 2-a(46), USSBS Index Section 6
Project No. 3692C452.19--12 December 1944-- test of totalizer type fuel level gauges in B-29 aircraft. Report No. 2-a(35), USSBS Index Section 6
Project No. 3964C452.22--12 December 1944-- test to determine quantity of inaccessible fuel in wing tanks of B-29 aircraft. Report No. 2-a(36), USSBS Index Section 6
Aluminum - Shibaura United Engineering Company: Labeled photographs of bomb damage with bomb plot attached. Report No. 36c(29)(b), USSBS Index Section 2
Project No. 4094C472.82--27 January 1945--test of Cornelius gun charger in B-29 airplane. Report No. 2-a(6), USSBS Index Section 6
Project No. 3864C452.1--4 January 1945-- operational suitability test of B-29 airplane. Report No. 2-a(2), USSBS Index Section 6
Project No. 3571C452.26--16 September 1944-- comparative test of B-29 with four-gun upper forward turret and B-29 with two-gun turrets. Report No. 2-a(9), USSBS Index Section 6
Project No. 4036C452.1--26 December 1944-- report of turbulence effect in bomb bay of B-29 airplane. Report No. 2-a(22), USSBS Index Section 6
Project No. 3815C413.44--12 June 1945--test of chaff dispensation from B-29 airplane. Report No. 2-a(53), USSBS Index Section 6
Test of SCR-519, over water precision blind bombing radar. Report No. 1o(139), USSBS Index Section 2
Project No. 3835C452.1--(M-5) 29--18 November 1944--test of four-gun General Electric turret model FI in upper forward position of B-29 air-plane. Report No. 2-a(32), USSBS Index Section 6
Project No. 4290C472.91--14 May 1945--test of three-gun caliber .50 machine gun installation in tail of B-29 airplane. Report No. 2-a(1), USSBS Index Section 6
Project No. 3828C452.1--(M-1) 136--24 Novem-ber 1944--test of fuel injection of B-29 airplane. Report No. 2-a(33), USSBS Index Section 6
Survey of effects of bomb fuze combinations on current enemy targets. Report No. 1o(14), USSBS Index Section 2
Project No. (M-1) 10c--20 June 1944--test of General Electric fire control equipment in B-29 Airplane. Report No. 2-a(11), USSBS Index Section 6
Terminal kinetic energy of bombs versus altitude of release(60-dive, 300 knots). Report No. 1o(100), USSBS Index Section 2
Last Updated:
Uploaded: 2020-12-17