Project No. 4474C471.6--11 June 1945--preliminary report on test of "tall boy" bomb in B-29 aircraft. Report No. 2-a(51), USSBS Index Section 6

Time
Owner Organization

More Like This

Project No. (M-1) 10d--23 July 1944--preliminary report of B-29 heat test (part of B-29 operational suitability test). Report No. 2-a(13), USSBS Index Section 6

Project No. (M-1) 10d--23 July 1944--preliminary report of B-29 heat test (part of B-29 operational suitability test). Report No. 2-a(13), USSBS Index Section 6

Project No. 3815C413.44--12 June 1945--test of chaff dispensation from B-29 airplane. Report No. 2-a(53), USSBS Index Section 6

Project No. 3815C413.44--12 June 1945--test of chaff dispensation from B-29 airplane. Report No. 2-a(53), USSBS Index Section 6

Test of modified sequence of bomb release in B-29 aircraft. Report No. 1o(122), USSBS Index Section 2

Test of modified sequence of bomb release in B-29 aircraft. Report No. 1o(122), USSBS Index Section 2

Project No. (M-1) 10c--20 June 1944--test of General Electric fire control equipment in B-29 Airplane. Report No. 2-a(11), USSBS Index Section 6

Project No. (M-1) 10c--20 June 1944--test of General Electric fire control equipment in B-29 Airplane. Report No. 2-a(11), USSBS Index Section 6

Project No. 4046C471.6--29 November 1944-- preliminary report on multiple suspensions of bombs in B-29 airplane. Report No. 2-a(34), USSBS Index Section 6

Project No. 4046C471.6--29 November 1944-- preliminary report on multiple suspensions of bombs in B-29 airplane. Report No. 2-a(34), USSBS Index Section 6

Project No. 3864C452.1--4 January 1945-- operational suitability test of B-29 airplane. Report No. 2-a(2), USSBS Index Section 6

Project No. 3864C452.1--4 January 1945-- operational suitability test of B-29 airplane. Report No. 2-a(2), USSBS Index Section 6

Project No. 4017C452.1--23 May 1945--cold weather test of B-29 type aircraft. Report No. 2-a(52), USSBS Index Section 6

Project No. 4017C452.1--23 May 1945--cold weather test of B-29 type aircraft. Report No. 2-a(52), USSBS Index Section 6

Project No. 4094C472.82--27 January 1945--test of Cornelius gun charger in B-29 airplane. Report No. 2-a(6), USSBS Index Section 6

Project No. 4094C472.82--27 January 1945--test of Cornelius gun charger in B-29 airplane. Report No. 2-a(6), USSBS Index Section 6

Project No. 3571C452.26--16 September 1944-- comparative test of B-29 with four-gun upper forward turret and B-29 with two-gun turrets. Report No. 2-a(9), USSBS Index Section 6

Project No. 3571C452.26--16 September 1944-- comparative test of B-29 with four-gun upper forward turret and B-29 with two-gun turrets. Report No. 2-a(9), USSBS Index Section 6

Project No. 2784C452.1--7 April 1945--test of bombing equipment installed in B-29 type aircraft. Report No. 2-a(42), USSBS Index Section 6

Project No. 2784C452.1--7 April 1945--test of bombing equipment installed in B-29 type aircraft. Report No. 2-a(42), USSBS Index Section 6

Project No. 4036C452.1--26 December 1944-- report of turbulence effect in bomb bay of B-29 airplane. Report No. 2-a(22), USSBS Index Section 6

Project No. 4036C452.1--26 December 1944-- report of turbulence effect in bomb bay of B-29 airplane. Report No. 2-a(22), USSBS Index Section 6

Preliminary atomic bomb report. Report No. 92a, USSBS Index Section 2

Preliminary atomic bomb report. Report No. 92a, USSBS Index Section 2

Project No. 8839C413.44--1 January 1945--test of radar set AN/APG-15 in B-29 aircraft. Report No. 2-a(46), USSBS Index Section 6

Project No. 8839C413.44--1 January 1945--test of radar set AN/APG-15 in B-29 aircraft. Report No. 2-a(46), USSBS Index Section 6

Project No. 3692C452.19--12 December 1944-- test of totalizer type fuel level gauges in B-29 aircraft. Report No. 2-a(35), USSBS Index Section 6

Project No. 3692C452.19--12 December 1944-- test of totalizer type fuel level gauges in B-29 aircraft. Report No. 2-a(35), USSBS Index Section 6

Project No. (T-1) 36--6 June 1944--doctrine of employment of B-29 airplane. Report No. 2-a(19), USSBS Index Section 6

Project No. (T-1) 36--6 June 1944--doctrine of employment of B-29 airplane. Report No. 2-a(19), USSBS Index Section 6

Project No. 3828C452.1--(M-1) 136--24 Novem-ber 1944--test of fuel injection of B-29 airplane. Report No. 2-a(33), USSBS Index Section 6

Project No. 3828C452.1--(M-1) 136--24 Novem-ber 1944--test of fuel injection of B-29 airplane. Report No. 2-a(33), USSBS Index Section 6

Project No. 3637B353.41--14 June 1945-- determination of training requirements of B-29 CFC gunnery (air phase), Report No. 2-a(50), USSBS Index Section 6

Project No. 3637B353.41--14 June 1945-- determination of training requirements of B-29 CFC gunnery (air phase), Report No. 2-a(50), USSBS Index Section 6

Project No. 3964C452.22--12 December 1944-- test to determine quantity of inaccessible fuel in wing tanks of B-29 aircraft. Report No. 2-a(36), USSBS Index Section 6

Project No. 3964C452.22--12 December 1944-- test to determine quantity of inaccessible fuel in wing tanks of B-29 aircraft. Report No. 2-a(36), USSBS Index Section 6

B-29 standard procedures, 20 June 1944. Report No. 1-e(1), USSBS Index Section 6

B-29 standard procedures, 20 June 1944. Report No. 1-e(1), USSBS Index Section 6

Project No. 4290C472.91--14 May 1945--test of three-gun caliber .50 machine gun installation in tail of B-29 airplane. Report No. 2-a(1), USSBS Index Section 6

Project No. 4290C472.91--14 May 1945--test of three-gun caliber .50 machine gun installation in tail of B-29 airplane. Report No. 2-a(1), USSBS Index Section 6

Project No. 4257B452.1--28 December 1944-- preliminary report on determination of training requirements for B-29 central fire control gun-nery (ground phase). Report No. 2-a(45), USSBS Index Section 6

Project No. 4257B452.1--28 December 1944-- preliminary report on determination of training requirements for B-29 central fire control gun-nery (ground phase). Report No. 2-a(45), USSBS Index Section 6

Project No. 3612A452.1--6 January 1945-- B-29 formation requirements. Report No. 2-a(7), USSBS Index Section 6

Project No. 3612A452.1--6 January 1945-- B-29 formation requirements. Report No. 2-a(7), USSBS Index Section 6

Japanese ground equipment bulletin No. 12, 15 June 1945. Report No. 12-b(29), USSBS Index Section 6

Japanese ground equipment bulletin No. 12, 15 June 1945. Report No. 12-b(29), USSBS Index Section 6

Project No. 3506C452.26--13 January 1945-- test of M-series Norden high-altitude bomb sight attachment. Report No. 2-a(4), USSBS Index Section 6

Project No. 3506C452.26--13 January 1945-- test of M-series Norden high-altitude bomb sight attachment. Report No. 2-a(4), USSBS Index Section 6

Last Updated:

Uploaded: 2020-12-17