Project No. 3964C452.22--12 December 1944-- test to determine quantity of inaccessible fuel in wing tanks of B-29 aircraft. Report No. 2-a(36), USSBS Index Section 6

利用条件: PDM

メタデータが似ているアイテム

Project No. 3692C452.19--12 December 1944-- test of totalizer type fuel level gauges in B-29 aircraft. Report No. 2-a(35), USSBS Index Section 6

Project No. 3692C452.19--12 December 1944-- test of totalizer type fuel level gauges in B-29 aircraft. Report No. 2-a(35), USSBS Index Section 6

Project No. 4237C471.6--28 December 1944-- preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 2-a(44), USSBS Index Section 6

Project No. 4237C471.6--28 December 1944-- preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 2-a(44), USSBS Index Section 6

Project No. 4248C452.1--27 December 1944-- preliminary report on test to determine maximum combat radius of P-51D airplane as escort for very heavy bombers. Report No. 2-a(43), USSBS Index Section 6

Project No. 4248C452.1--27 December 1944-- preliminary report on test to determine maximum combat radius of P-51D airplane as escort for very heavy bombers. Report No. 2-a(43), USSBS Index Section 6

Project No. 3828C452.1--(M-1) 136--24 Novem-ber 1944--test of fuel injection of B-29 airplane. Report No. 2-a(33), USSBS Index Section 6

Project No. 3828C452.1--(M-1) 136--24 Novem-ber 1944--test of fuel injection of B-29 airplane. Report No. 2-a(33), USSBS Index Section 6

Project No. (M-1) 10d--23 July 1944--preliminary report of B-29 heat test (part of B-29 operational suitability test). Report No. 2-a(13), USSBS Index Section 6

Project No. (M-1) 10d--23 July 1944--preliminary report of B-29 heat test (part of B-29 operational suitability test). Report No. 2-a(13), USSBS Index Section 6

Project No. (T-1) 25--17 June 1944--test to determine proper ratio and technique for employment of incendiary and high-explosive bombs against Japanese type structures. Report No. 2-a(18), USSBS Index Section 6

Project No. (T-1) 25--17 June 1944--test to determine proper ratio and technique for employment of incendiary and high-explosive bombs against Japanese type structures. Report No. 2-a(18), USSBS Index Section 6

Project No. 3240C471.6--27 December 1944-- comparative test of fragment density and pene-tration effect from standard demolition and wire wrapped demolition type bombs. Report No. 2-a(41), USSBS Index Section 6

Project No. 3240C471.6--27 December 1944-- comparative test of fragment density and pene-tration effect from standard demolition and wire wrapped demolition type bombs. Report No. 2-a(41), USSBS Index Section 6

Project No. 4036C452.1--26 December 1944-- report of turbulence effect in bomb bay of B-29 airplane. Report No. 2-a(22), USSBS Index Section 6

Project No. 4036C452.1--26 December 1944-- report of turbulence effect in bomb bay of B-29 airplane. Report No. 2-a(22), USSBS Index Section 6

Project No. (T-1) 36--6 June 1944--doctrine of employment of B-29 airplane. Report No. 2-a(19), USSBS Index Section 6

Project No. (T-1) 36--6 June 1944--doctrine of employment of B-29 airplane. Report No. 2-a(19), USSBS Index Section 6

M354--18E, Japanese administration of occupied areas, Thailand, 15 December-1944. Report No. 36-a(27), USSBS Index Section 6

M354--18E, Japanese administration of occupied areas, Thailand, 15 December-1944. Report No. 36-a(27), USSBS Index Section 6

Project No. 3538C452.26-6 January 1945-- test of dropping M-10 and M-33 chemical spray tanks from high-speed fighter aircraft. Report No. 2-a(8), USSBS Index Section 6

Project No. 3538C452.26-6 January 1945-- test of dropping M-10 and M-33 chemical spray tanks from high-speed fighter aircraft. Report No. 2-a(8), USSBS Index Section 6

Project No. (M-1) 10c--20 June 1944--test of General Electric fire control equipment in B-29 Airplane. Report No. 2-a(11), USSBS Index Section 6

Project No. (M-1) 10c--20 June 1944--test of General Electric fire control equipment in B-29 Airplane. Report No. 2-a(11), USSBS Index Section 6

Project No. (M-5) 209--19 July 1944--test of four-gun General-Electric turret in upper aft position of B-29 airplane. Report No. 2-a(15), USSBS Index Section 6

Project No. (M-5) 209--19 July 1944--test of four-gun General-Electric turret in upper aft position of B-29 airplane. Report No. 2-a(15), USSBS Index Section 6

Report on Japanese files research project (special report and directory), 21 December 1944. Report No. 19-b(178), USSBS Index Section 6

Report on Japanese files research project (special report and directory), 21 December 1944. Report No. 19-b(178), USSBS Index Section 6

Project No. 3864C452.1--4 January 1945-- operational suitability test of B-29 airplane. Report No. 2-a(2), USSBS Index Section 6

Project No. 3864C452.1--4 January 1945-- operational suitability test of B-29 airplane. Report No. 2-a(2), USSBS Index Section 6

Project No. 3835C452.1--(M-5) 29--18 November 1944--test of four-gun General Electric turret model FI in upper forward position of B-29 air-plane. Report No. 2-a(32), USSBS Index Section 6

Project No. 3835C452.1--(M-5) 29--18 November 1944--test of four-gun General Electric turret model FI in upper forward position of B-29 air-plane. Report No. 2-a(32), USSBS Index Section 6

Project No. 3571C452.26--16 September 1944-- comparative test of B-29 with four-gun upper forward turret and B-29 with two-gun turrets. Report No. 2-a(9), USSBS Index Section 6

Project No. 3571C452.26--16 September 1944-- comparative test of B-29 with four-gun upper forward turret and B-29 with two-gun turrets. Report No. 2-a(9), USSBS Index Section 6

Project No. 3815C413.44--12 June 1945--test of chaff dispensation from B-29 airplane. Report No. 2-a(53), USSBS Index Section 6

Project No. 3815C413.44--12 June 1945--test of chaff dispensation from B-29 airplane. Report No. 2-a(53), USSBS Index Section 6

Project No. 4017C452.1--23 May 1945--cold weather test of B-29 type aircraft. Report No. 2-a(52), USSBS Index Section 6

Project No. 4017C452.1--23 May 1945--cold weather test of B-29 type aircraft. Report No. 2-a(52), USSBS Index Section 6

Translation No. 12, 15 December 1944, coastal survey of Shimushu. Report No. 3-d(12), USSBS Index Section 6

Translation No. 12, 15 December 1944, coastal survey of Shimushu. Report No. 3-d(12), USSBS Index Section 6

Project No. 4257B452.1--28 December 1944-- preliminary report on determination of training requirements for B-29 central fire control gun-nery (ground phase). Report No. 2-a(45), USSBS Index Section 6

Project No. 4257B452.1--28 December 1944-- preliminary report on determination of training requirements for B-29 central fire control gun-nery (ground phase). Report No. 2-a(45), USSBS Index Section 6

Preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 1o(94), USSBS Index Section 2

Preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 1o(94), USSBS Index Section 2

Project No. 4094C472.82--27 January 1945--test of Cornelius gun charger in B-29 airplane. Report No. 2-a(6), USSBS Index Section 6

Project No. 4094C472.82--27 January 1945--test of Cornelius gun charger in B-29 airplane. Report No. 2-a(6), USSBS Index Section 6

Project No. 4354C413.44--18 May 1945--cold weather test of AN/APG-13 radar set. Report No. 2-a(49), USSBS Index Section 6

Project No. 4354C413.44--18 May 1945--cold weather test of AN/APG-13 radar set. Report No. 2-a(49), USSBS Index Section 6

最終更新日:

登録日: 2020-12-17

Project No. 3964C452.22--12 December 1944-- test to determine quantity of inaccessible fuel in wing tanks of B-29 aircraft. Report No. 2-a(36), USSBS Index Section 6 | Cultural Japan