
TRIPLE SCREW SUBMARINE SCREEN BOAT

ARMOUR BARS IN AND AROUND FUNNEL UPTAKES/ARRANGEMENT OF ARMOUR BOLTS/POSITION OF ARMOUR BOLTS AND DETAILS/ARMOUR BOLT/ARMOUR BOLT FOR MAIN DECK BATTERY SIDES AND BULKD HEADS/BOLTS FOR SECURING BELT ARMOUR TO STEM CASTING/FORWARD BARBETTESKETCH SHEWING RIVETING/AFTER MAIN DECK SCREEN BULKHEAD/DETAIL OF ARMOUR DOOR IN SCREEN BULKHEADS/SCREEN BULKHEAD AFT ABOVE MIDDLE DECK/SCREEN BULKHEAD AFT BELOW MIDDLE DECK/SCKETCH SHEWING JUNCTION OF BELT ARMOUR & AFTER SCREEN BULKHEAD/BATTERY/OVERHEAD DISMOUNTING GEAR FOR
Third Section 15 July 1950 - Aug. 1950

ARMOUR BARS IN AND AROUND FUNNEL UPTAKES/ARRANGEMENT OF ARMOUR BOLTS/POSITION OF ARMOUR BOLTS AND DETAILS/ARMOUR BOLT/ARMOUR BOLT FOR MAIN DECK BATTERY SIDES AND BULKD HEADS/BOLTS FOR SECURING BELT ARMOUR TO STEM CASTING/AFTER MAIN DECK SCREEN BULKHEAD/DETAIL OF ARMOUR DOOR IN SCREEN BULKHEADS/SCREEN BULKHEAD AFT ABOVE MIDDLE DECK/SCREEN BULKHEAD AFT BELOW MIDDLE DECK/SKETCH SHEWING JUNCTION OF BELT ARMOUR & AFTER SCREEN BULKHEAD/BATTELY/OVERHEAD DISMOUNTING GEAR FOR 6 INCH GUNS/SKETCH SHEWING RIVETING OF M

(Prostitute and Her Guest in front of Chrysanthenum Screen)

〔Section〕
Third Naval fuel Depot - Tokuyama: Flow diagrams. Report No. 51a(9)(j), USSBS Index Section 2
Third Naval fuel Depot - Tokuyama: Final report. Report No. 51a(9)(a), USSBS Index Section 2

Section Through Compartments

SECTION AT FRAME

SECTION AREA/L.W.L
Third Naval fuel Depot - Tokuyama: Bomb damage summary. Report No. 51a(9)(f), USSBS Index Section 2
Third Naval fuel Depot - Tokuyama: Damage assessment report. Report No. 51a(9)(n), USSBS Index Section 2
Third Naval fuel Depot - Tokuyama: Process control data. Report No. 51a(9)(i), USSBS Index Section 2
Third Naval fuel Depot - Tokuyama: Physical damage report. Report No. 51a(9)(c), USSBS Index Section 2
Third Naval fuel Depot - Tokuyama: Bomb plot (Japanese). Report No. 51a(9)(k), USSBS Index Section 2
Third Naval fuel Depot - Tokuyama: Photographs and negatives. Report No. 51a(9)(m), USSBS Index Section 2
Court Exh. No. 382: Office Report for 1939 of the Third Section of the Treaty Bureau, Foreign Ministry
Third Naval fuel Depot - Tokuyama: Complete inventory of depot. Report No. 51a(9)(g), USSBS Index Section 2
Court Exh. No. 382: Office Report for 1939 of the Third Section of the Treaty Bureau, Foreign Ministry
Third Naval fuel Depot - Tokuyama: Refinery plot plan (Japanese). Report No. 51a(9)(l), USSBS Index Section 2
Third Naval fuel Depot - Tokuyama: Specifications for refined products. Report No. 51a(9)(e), USSBS Index Section 2

Section Amidships Full Size

H.I.J.M.S "CHIYODA" MIDSHIP SECTION

Curve of Initial Stability“YAEYAMA”・Righting Moment/八重山浮揚計画要領

ARMOUR BARS IN AND AROUND FUNNEL UPTAKES/ARRANGEMENT OF ARMOUR BOLTS/POSITION OF ARMOUR BOLTS AND DETAILS/ARMOUR BOLT/ARMOUR BOLT FOR MAIN DECK BATTERY SIDES AND BULKD HEADS/BOLTS FOR SECURING BELT ARMOUR TO STEM CASTING/AFTER MAIN DECK SCREEN BULKHEAD/DETAIL OF ARMOUR DOOR IN SCREEN BULKHEADS/SCREEN BULKHEAD AFT ABOVE MIDDLE DECK/SCREEN BULKHEAD AFT BELOW MIDDLE DECK/SKETCH SHEWING JUNCTION OF BELT ARMOUR & AFTER SCREEN BULKHEAD/BATTELY/OVERHEAD DISMOUNTING GEAR FOR 6 INCH GUNS/SKETCH SHEWING RIVETING OF M

〔大正15年3月15日付平賀技術研究所長宛笹井造船中佐送付状〕

no.4.Funmmel Hatch

〔1906.7.31買い物控〕

〔大正8.8.18付平賀発有田監督官宛書翰/大正8.8.15付有田監督官発平賀宛書翰 他〕

八.六.二日 森田中佐殿 平賀大監

〔数値一覧・メモ〕

〔水圧試験結果レポート・横須賀海軍工廠造船部造船工場〕

〔計算メモ〕

H.I.J.M.S "CHIYODA" MIDSHIP SECTION

明治四十年五月七日提出草稿 ”インドミテーブル”ニ就テ

〔伊勢級・長門級・加賀級・金剛級改造案〕

諸室一覧表

〔3000トン大駆計画メモ〕

〔昭和8.6.18付 平賀発皆川多三郎宛書翰(草稿)〕

〔大正3.1.10付山本大監発平賀宛書翰:四号戦艦ノ件〕

〔シャフトブラケット関係図〕

Lord Nelson

〔平賀の勤務曜日・関係学会一覧〕

七年七月第三艦隊ニ用ヒシモノ

〔射撃データメモ〕

〔メモ・寸法図〕

佐廠 福井造船中監 平賀大監殿 大正七年十一月廿二日
Last Updated:
Uploaded: 2021-07-29
