Diesel Engines for the Navy Marine Engineering and Shipping Age. Dec.1927 By Edward C.Magdeburger

BULK OIL-CARRYING VESSEL

A REVIEW OF THE PROPELLING EQUIPMENT AND OPERATION OF THE NEW MEXICO. By Eskil Berg. September 16th,1919

PROTECTION OF CAPITAL SHIPS

"KONGO,FUSO,ISE AND NAGATO". CALCULATION OF STRESS ON GIRDER TO SUSPEND THE RUDDER

STATUS OF SHIP PROPULSION WITH PARTICULAR REFERENCE TO ELECTRIC PROPELLING EQUIPMENT

Determining Steel Weight. A Method which has Proved of value

AN EXTRACTION FROM THE STATEMENTS OF HON.JOSEPHUS DANIELS,Secretary of the Navy

〔寸法一覧表〕

INSTITUTION OF NAVAL ARCHITECTS

Estimated Weight and Position of Center of Gravity

SPECIFICATION For The Supply of .303 in. Mark VII Cartridges With Service Bullets and Nitrocellulose Powder

電気鎔接使用範囲ニ関スル意見 呉海軍工廠造船部 10.12

〔人名一覧〕

"INDEFATIGABLE"Arrangements of Steam & Exhaust pipe,Drainage & Auxiliary Machinery

〔説明書?〕

DETEMINATION OF SHIP'S SIZE AND FORM WITHOUT A PROCESS OF TRIAL AND ERROR BY Alexander Kari, M.So

ACTUAL WEIGHT FOR "TONE" 10th April,1911.Copied

Launch of Saratoga

3.Mediterranee造船所(La Seyne)視察報告

米国軍事彙報 第29号 昭和5.4.1 海軍軍令部第三班 艦上短波長送信機ノ危険

PROFESSIONAL NOTES

NEW CONSTRUCTION FOR FOREIGN NAVIES

電気鎔接ニ関スル計画主任合会議記事 艦政本部四部 10.12

長門ノ今後出図スベキ予定
Last Updated:
Uploaded: 2021-07-29


