"Minotour" Sketch showing Deflection of Bhds due to waterTest 7-5-6

IIIF
Owner Organization

More Like This

"KingEdward VII" Deflection of lhd due to watertest conducted 4/7/03

"KingEdward VII" Deflection of lhd due to watertest conducted 4/7/03

KingEdwardVII Deflection of lhd 108 due to water test conducted 4/7/03

KingEdwardVII Deflection of lhd 108 due to water test conducted 4/7/03

"Minotour" 6 7 1/2 bhd

"Minotour" 6 7 1/2 bhd

14-9-05 Minotour Ceiling in Ca□□s of behind armour. 5-6-05

14-9-05 Minotour Ceiling in Ca□□s of behind armour. 5-6-05

SKETCH BOOK Volume 6 from 7|11|33 to 17|11|33 at Yokosuka Naval Shipyard

SKETCH BOOK Volume 6 from 7|11|33 to 17|11|33 at Yokosuka Naval Shipyard

SKETCH BOOK Volume 5 from 27|10|33 to 7|11|33 at Yokosuka Naval Shipyard

SKETCH BOOK Volume 5 from 27|10|33 to 7|11|33 at Yokosuka Naval Shipyard

"Minotour" Expansion Joints Between Uptakes of Deck coaming full size 26/7/06

"Minotour" Expansion Joints Between Uptakes of Deck coaming full size 26/7/06

11-5-6・12-7-24 From Tosu

11-5-6・12-7-24 From Tosu

THE DISTRIBUTION OF STRESS DUE TO A RIVET IN A PLATE

THE DISTRIBUTION OF STRESS DUE TO A RIVET IN A PLATE

SKETCH BOOK Volume 3. from 25|8|33 to 5|10|33 at Yokosuka Naval Shipyard

SKETCH BOOK Volume 3. from 25|8|33 to 5|10|33 at Yokosuka Naval Shipyard

SKETCH BOOK Volume 2. from 25|7|33 to 3|8|33 at Yokosuka Naval Shipyard

SKETCH BOOK Volume 2. from 25|7|33 to 3|8|33 at Yokosuka Naval Shipyard

SKETCH BOOK Volume 7. from 24|11|33 to 18|12|33 at Kure Naval Shipyard

SKETCH BOOK Volume 7. from 24|11|33 to 18|12|33 at Kure Naval Shipyard

Fig. 1-5. Pyramids ; Fig. 6. A sort of an altar ; Fig. 7. An open house

Fig. 1-5. Pyramids ; Fig. 6. A sort of an altar ; Fig. 7. An open house

ARMOUR BARS IN AND AROUND FUNNEL UPTAKES/ARRANGEMENT OF ARMOUR BOLTS/POSITION OF ARMOUR BOLTS AND DETAILS/ARMOUR BOLT/ARMOUR BOLT FOR MAIN DECK BATTERY SIDES AND BULKD HEADS/BOLTS FOR SECURING BELT ARMOUR TO STEM CASTING/AFTER MAIN DECK SCREEN BULKHEAD/DETAIL OF ARMOUR DOOR IN SCREEN BULKHEADS/SCREEN BULKHEAD AFT ABOVE MIDDLE DECK/SCREEN BULKHEAD AFT BELOW MIDDLE DECK/SKETCH SHEWING JUNCTION OF BELT ARMOUR & AFTER SCREEN BULKHEAD/BATTELY/OVERHEAD DISMOUNTING GEAR FOR 6 INCH GUNS/SKETCH SHEWING RIVETING OF M

ARMOUR BARS IN AND AROUND FUNNEL UPTAKES/ARRANGEMENT OF ARMOUR BOLTS/POSITION OF ARMOUR BOLTS AND DETAILS/ARMOUR BOLT/ARMOUR BOLT FOR MAIN DECK BATTERY SIDES AND BULKD HEADS/BOLTS FOR SECURING BELT ARMOUR TO STEM CASTING/AFTER MAIN DECK SCREEN BULKHEAD/DETAIL OF ARMOUR DOOR IN SCREEN BULKHEADS/SCREEN BULKHEAD AFT ABOVE MIDDLE DECK/SCREEN BULKHEAD AFT BELOW MIDDLE DECK/SKETCH SHEWING JUNCTION OF BELT ARMOUR & AFTER SCREEN BULKHEAD/BATTELY/OVERHEAD DISMOUNTING GEAR FOR 6 INCH GUNS/SKETCH SHEWING RIVETING OF M

King Edward VII. Blast Screens Side Sighting food 12" gun, Minatour Class Floor and Roller-path plate in 7.5" Barlette, Hiberuia fore 9.2" barlette, Minatour Riveting of K.N.C. Floors of 9.2" Barlette, King EdwardVII. Aft 12" barlette, Minatour 7.5" Gun Supports(No.3), Hiberuia fore Barlette 9.2", Minatour Particulars of ?? conncting with 9.2" Barlette, King Edwards VII Gun Support to Aft 12", King Edwards VII 12" Aft Barlette, No.11 Plate ,Minatour Electric Lift Wire, Minatour Elevation of no.5

King Edward VII. Blast Screens Side Sighting food 12" gun, Minatour Class Floor and Roller-path plate in 7.5" Barlette, Hiberuia fore 9.2" barlette, Minatour Riveting of K.N.C. Floors of 9.2" Barlette, King EdwardVII. Aft 12" barlette, Minatour 7.5" Gun Supports(No.3), Hiberuia fore Barlette 9.2", Minatour Particulars of ?? conncting with 9.2" Barlette, King Edwards VII Gun Support to Aft 12", King Edwards VII 12" Aft Barlette, No.11 Plate ,Minatour Electric Lift Wire, Minatour Elevation of no.5

Last Updated:

Uploaded: 2021-07-29