Water power plant operating statistics January 1945-December 1945-Copy No. 1. Report No. 40r(7), USSBS Index Section 2
Water power plant operating statistics January 1943-December 1943-Copy No. 1. Report No. 40r(3), USSBS Index Section 2
Water power plant operating statistics January 1944-December 1944-Copy No. 1. Report No. 40r(5), USSBS Index Section 2
Water power plant operating statistics January 1942-December 1942-Copy No. 1. Report No. 40r(1), USSBS Index Section 2
Report on Seto water power plant. Report No. 41g(4), USSBS Index Section 2
Vertical section diagram of water power plant. Report No. 41r(5), USSBS Index Section 2
Visual bombing for December, January, Febru-ary, 1945. Report No. 1o(154), USSBS Index Section 2
Basic electric power statistics. Report No. 40g(3), USSBS Index Section 2
January-June, November-December 1944. Report No. 54lll(3), USSBS Index Section 2
ACA-1 Reports for the Period 25 December 1944 to 26 January 1945 Report No. 2-d(21): USS Cabot, USSBS Index Section 7
Statistics on plant operation. Report No. 41dd(1), USSBS Index Section 2
Indexes to abstracts on European and Far Eastern personalities, January 1945-December 1945. Report No. 35-a(5), USSBS Index Section 6
Ube steam power plant: Report by plant officials. Report No. 90g(13)(a), USSBS Index Section 2
Photo of Kawabe power plant. Report No. 41g(11), USSBS Index Section 2
General plan of power plant. Report No. 41u(5), USSBS Index Section 2
Shimizu: Statistics on consumption of fuel and electric power(part Japanese). Report No. 57b(7)(d), USSBS Index Section 2
Types of aircraft produced in Naruo plant, January 1939-August 1945. Report No. 18b(3), USSBS Index Section 2
Statistical digest, World War II, December 1945. Report No. 2-k(1), USSBS Index; Section 7
Notes and statistics on Japanese power plants. Report No. 40k(1), USSBS Index Section 2
Report on water plant. Report No. 41q(1), USSBS Index Section 2
Report on water plant. Report No. 41r(1), USSBS Index Section 2
Translation No. 7, 2 December 1944. Report No. 3-c(7), USSBS Index Section 6
Outline of the Seto power plant. Report No. 41g(3), USSBS Index Section 2
Iwakuni Army Refinery: Interrogation-plant operating officials. Report No. 51a(3)(i), USSBS Index Section 2
Company operating report and inventory record, Kashiwasaki plant. Report No. 39b(13), USSBS Index Section 2
最終更新日:
登録日: 2020-12-17