Miyazu and Kunda Wan, terminal facilities. Report No. 1o(1), USSBS Index Section 2
- Owner Organization
Ordnance and terminal ballistics. Report No. 1o(93), USSBS Index Section 2
Information concerning terminal ballistics. Report No. 1o(79), USSBS Index Section 2
Transmission and distribution facilities and equipment. Report No. 40i(1), USSBS Index Section 2
Engineering study of French Indo-China, Vol. V, section 1, port and terminal facilities, and section 2, electric power. Report No. 12-a(2), USSBS Index Section 6
Engineering study of French Indo-China, Vol. V, section 1, port and terminal facilities, and section 2, electric power. Report No. 12-a(2), USSBS Index Section 6
Charts showing transport facilities and capacities. Report No. 54ccc(1), USSBS Index Section 2
List of shipbuilding and manufacturing facilities. Report No. 39l(1), USSBS Index Section 2
Vulnerability of repairs facilities to marshalling yards. Report No. 1o(36), USSBS Index Section 2
Target and bomb selection. Report No. 1o(155), USSBS Index Section 2
Air and earth shock. Report No. 1o(72), USSBS Index Section 2
Air and earth shock. Report No. 1o(72), USSBS Index Section 2
Aircraft maintenance and repair. Report No. 1o(158), USSBS Index Section 2
Bomb and Fuze Selection. Report No. 1o(166), USSBS Index Section 2
Railroads and railroad facilities. Report No. 11l(13), USSBS Index Section 2
Docks and harbor facilities. Report No. 46i(8), USSBS Index Section 2
Napalm. Report No. 1o(161), USSBS Index Section 2
Combustibility. Report No. 1o(117), USSBS Index Section 2
Tactical bombing analysis and critique. Report No. 1o(140), USSBS Index Section 2
Penetration (concrete). Report No. 1o(120), USSBS Index Section 2
Formation bombing. Report No. 1o(121), USSBS Index Section 2
Target information. Report No. 1o(169), USSBS Index Section 2
Flame attack. Report No. 1o(99), USSBS Index Section 2
Aircraft reports. Report No. 1o(159), USSBS Index Section 2
PFF operations. Report No. 1o(111), USSBS Index Section 2
Last Updated:
Uploaded: 2020-12-17