Cultural Japan
SearchCategoryEraNewsUsageSettings
  1. Top
  2. Search
  3. Selected target clusters suitable as alternate targets for radar bombing (preliminary draft, 28 December 1944). Report No. 14-a(11), USSBS Index Section 6
Selected target clusters suitable as alternate targets for radar bombing (preliminary draft, 28 December 1944). Report No. 14-a(11), USSBS Index Section 6
RDF DataOriginal Site

Selected target clusters suitable as alternate targets for radar bombing (preliminary draft, 28 December 1944). Report No. 14-a(11), USSBS Index Section 6

License: Public Domain Mark
Time
1944
Owner Organization
NDL Digital Collections

More Like This

United States Strategic Bombing Survey report on operations, 7 December 1941-14 August 1945 (preliminary draft). Report No. 2-f(2), USSBS Index; Section 7

United States Strategic Bombing Survey report on operations, 7 December 1941-14 August 1945 (preliminary draft). Report No. 2-f(2), USSBS Index; Section 7

Report No. 745, June 1944--incendiary bombing conditions on flyable days at selected Japanese targets. Report No. 2-a(66), USSBS Index Section 6

Report No. 745, June 1944--incendiary bombing conditions on flyable days at selected Japanese targets. Report No. 2-a(66), USSBS Index Section 6

A. T. P. No. 147A-44, 1 October 1944, air target maps and photos, selected targets, Tokyo Bay area. Report No. 3-h(5), USSBS Index Section 6

A. T. P. No. 147A-44, 1 October 1944, air target maps and photos, selected targets, Tokyo Bay area. Report No. 3-h(5), USSBS Index Section 6

Project No. 4237C471.6--28 December 1944-- preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 2-a(44), USSBS Index Section 6

Project No. 4237C471.6--28 December 1944-- preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 2-a(44), USSBS Index Section 6

Project No. 4257B452.1--28 December 1944-- preliminary report on determination of training requirements for B-29 central fire control gun-nery (ground phase). Report No. 2-a(45), USSBS Index Section 6

Project No. 4257B452.1--28 December 1944-- preliminary report on determination of training requirements for B-29 central fire control gun-nery (ground phase). Report No. 2-a(45), USSBS Index Section 6

Last Updated:

Uploaded: 2020-12-17

Cultural Japan

  • About this site
  • Team
  • News
  • Policy
  • Contact
  • For Developers

Tools

  • Search
  • Browse by Category
  • Browse by Place
  • Browse by Era
  • RDF Store

Usage

  • Self Museum
  • Cultural Japan Exhibitions Archive
  • Comparison of Kuni-ezu (Map)
  • NPL Visualization
  • IIIF Collection
  • Other Examples

Links

  • Japan Search
  • Japan Search unofficial support page
  • Europeana
  • DPLA
  • Trove
  • Twitter
Cultural Japan