Project No. 4257B452.1--28 December 1944-- preliminary report on determination of training requirements for B-29 central fire control gun-nery (ground phase). Report No. 2-a(45), USSBS Index Section 6

Time
Owner Organization

More Like This

Project No. 3637B353.41--14 June 1945-- determination of training requirements of B-29 CFC gunnery (air phase), Report No. 2-a(50), USSBS Index Section 6

Project No. 3637B353.41--14 June 1945-- determination of training requirements of B-29 CFC gunnery (air phase), Report No. 2-a(50), USSBS Index Section 6

Project No. 4237C471.6--28 December 1944-- preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 2-a(44), USSBS Index Section 6

Project No. 4237C471.6--28 December 1944-- preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 2-a(44), USSBS Index Section 6

Project No. (T) 34--26 July 1944--gunnery handbook for B-29 central fire control. Report No. 2-a(14), USSBS Index Section 6

Project No. (T) 34--26 July 1944--gunnery handbook for B-29 central fire control. Report No. 2-a(14), USSBS Index Section 6

Preliminary drafts of fire study. Report No. 90f(1), USSBS Index Section 2

Preliminary drafts of fire study. Report No. 90f(1), USSBS Index Section 2

Project No. 4231A471.6--15 December 1944-- preliminary report on Willie (Baby) aircraft controlled from B-29s on long-range missions. Report No. 2-a(21), USSBS Index Section 6

Project No. 4231A471.6--15 December 1944-- preliminary report on Willie (Baby) aircraft controlled from B-29s on long-range missions. Report No. 2-a(21), USSBS Index Section 6

Project No. 3612A452.1--6 January 1945-- B-29 formation requirements. Report No. 2-a(7), USSBS Index Section 6

Project No. 3612A452.1--6 January 1945-- B-29 formation requirements. Report No. 2-a(7), USSBS Index Section 6

Project No. 3636B452.1--21 April 1945--deter-mination of B-29 primary and secondary control requirements. Report No. 2-a(27), USSBS Index Section 6

Project No. 3636B452.1--21 April 1945--deter-mination of B-29 primary and secondary control requirements. Report No. 2-a(27), USSBS Index Section 6

Project No. 4248C452.1--27 December 1944-- preliminary report on test to determine maximum combat radius of P-51D airplane as escort for very heavy bombers. Report No. 2-a(43), USSBS Index Section 6

Project No. 4248C452.1--27 December 1944-- preliminary report on test to determine maximum combat radius of P-51D airplane as escort for very heavy bombers. Report No. 2-a(43), USSBS Index Section 6

Report on Japanese files research project (special report and directory), 21 December 1944. Report No. 19-b(178), USSBS Index Section 6

Report on Japanese files research project (special report and directory), 21 December 1944. Report No. 19-b(178), USSBS Index Section 6

Training order "B" issued by Governor of Hyogo Prefecture on 6 June 1944 on training districts, training, fire fighting and operations. Report No. 7zz, USSBS Index Section 2

Training order "B" issued by Governor of Hyogo Prefecture on 6 June 1944 on training districts, training, fire fighting and operations. Report No. 7zz, USSBS Index Section 2

Preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 1o(94), USSBS Index Section 2

Preliminary report on test of incendiary mixture for use in droppable tanks as fire bombs. Report No. 1o(94), USSBS Index Section 2

Project No. 4046C471.6--29 November 1944-- preliminary report on multiple suspensions of bombs in B-29 airplane. Report No. 2-a(34), USSBS Index Section 6

Project No. 4046C471.6--29 November 1944-- preliminary report on multiple suspensions of bombs in B-29 airplane. Report No. 2-a(34), USSBS Index Section 6

Project No. 4614A471.6--26 April 1945--study of requirements, employment and effectiveness of large bombs. Report No. 2-a(56), USSBS Index Section 6

Project No. 4614A471.6--26 April 1945--study of requirements, employment and effectiveness of large bombs. Report No. 2-a(56), USSBS Index Section 6

United States Strategic Bombing Survey report on operations, 7 December 1941-14 August 1945 (preliminary draft). Report No. 2-f(2), USSBS Index; Section 7

United States Strategic Bombing Survey report on operations, 7 December 1941-14 August 1945 (preliminary draft). Report No. 2-f(2), USSBS Index; Section 7

Project No. 4036C452.1--26 December 1944-- report of turbulence effect in bomb bay of B-29 airplane. Report No. 2-a(22), USSBS Index Section 6

Project No. 4036C452.1--26 December 1944-- report of turbulence effect in bomb bay of B-29 airplane. Report No. 2-a(22), USSBS Index Section 6

Project No. 4474C471.6--11 June 1945--preliminary report on test of "tall boy" bomb in B-29 aircraft. Report No. 2-a(51), USSBS Index Section 6

Project No. 4474C471.6--11 June 1945--preliminary report on test of "tall boy" bomb in B-29 aircraft. Report No. 2-a(51), USSBS Index Section 6

Project No. (M-1) 10c--20 June 1944--test of General Electric fire control equipment in B-29 Airplane. Report No. 2-a(11), USSBS Index Section 6

Project No. (M-1) 10c--20 June 1944--test of General Electric fire control equipment in B-29 Airplane. Report No. 2-a(11), USSBS Index Section 6

Information on the training program of Tokyo fire department (Japanese with excerpts translated). Report No. 10qq(1), USSBS Index Section 2

Information on the training program of Tokyo fire department (Japanese with excerpts translated). Report No. 10qq(1), USSBS Index Section 2

Report on purchases of American machine tools by Chuo Kogyo K. K. (Central Industrial Company), 16 December 1943. Report No. 19-b(102), USSBS Index Section 6

Report on purchases of American machine tools by Chuo Kogyo K. K. (Central Industrial Company), 16 December 1943. Report No. 19-b(102), USSBS Index Section 6

Selected target clusters suitable as alternate targets for radar bombing (preliminary draft, 28 December 1944). Report No. 14-a(11), USSBS Index Section 6

Selected target clusters suitable as alternate targets for radar bombing (preliminary draft, 28 December 1944). Report No. 14-a(11), USSBS Index Section 6

Project No. (M-1) 10d--23 July 1944--preliminary report of B-29 heat test (part of B-29 operational suitability test). Report No. 2-a(13), USSBS Index Section 6

Project No. (M-1) 10d--23 July 1944--preliminary report of B-29 heat test (part of B-29 operational suitability test). Report No. 2-a(13), USSBS Index Section 6

Project No. 3692C452.19--12 December 1944-- test of totalizer type fuel level gauges in B-29 aircraft. Report No. 2-a(35), USSBS Index Section 6

Project No. 3692C452.19--12 December 1944-- test of totalizer type fuel level gauges in B-29 aircraft. Report No. 2-a(35), USSBS Index Section 6

Project No. 4324A471.6--26 March 1945-- preliminary guide to tactical employment of air-burst fragmentation and general-purpose bombs. Report No. 2-a(25), USSBS Index Section 6

Project No. 4324A471.6--26 March 1945-- preliminary guide to tactical employment of air-burst fragmentation and general-purpose bombs. Report No. 2-a(25), USSBS Index Section 6

Project No. 3964C452.22--12 December 1944-- test to determine quantity of inaccessible fuel in wing tanks of B-29 aircraft. Report No. 2-a(36), USSBS Index Section 6

Project No. 3964C452.22--12 December 1944-- test to determine quantity of inaccessible fuel in wing tanks of B-29 aircraft. Report No. 2-a(36), USSBS Index Section 6

Last Updated:

Uploaded: 2020-12-17