Project No. 3636B452.1--21 April 1945--deter-mination of B-29 primary and secondary control requirements. Report No. 2-a(27), USSBS Index Section 6
- Time
- Owner Organization
Project No. 3612A452.1--6 January 1945-- B-29 formation requirements. Report No. 2-a(7), USSBS Index Section 6
Oil requirements: Navy requirements. Report No. 51b(21)(b), USSBS Index Section 2
Project No. 4094C472.82--27 January 1945--test of Cornelius gun charger in B-29 airplane. Report No. 2-a(6), USSBS Index Section 6
Project No. 4257B452.1--28 December 1944-- preliminary report on determination of training requirements for B-29 central fire control gun-nery (ground phase). Report No. 2-a(45), USSBS Index Section 6
Project No. 3637B353.41--14 June 1945-- determination of training requirements of B-29 CFC gunnery (air phase), Report No. 2-a(50), USSBS Index Section 6
Project No. (T) 34--26 July 1944--gunnery handbook for B-29 central fire control. Report No. 2-a(14), USSBS Index Section 6
Project No. 2784C452.1--7 April 1945--test of bombing equipment installed in B-29 type aircraft. Report No. 2-a(42), USSBS Index Section 6
No. 27-44, 1 April 1944, information on Ponape Island. Report No. 11-b(6), USSBS Index Section 6
No. 225, 26 April 1945, Japanese control asso-ciations. Report No. 13-b(12), USSBS Index Section 6
Project No. 4614A471.6--26 April 1945--study of requirements, employment and effectiveness of large bombs. Report No. 2-a(56), USSBS Index Section 6
Report on Japanese automotive industry, 27 April 1943. Report No. 19-b(35), USSBS Index Section 6
Project No. (M-1) 10c--20 June 1944--test of General Electric fire control equipment in B-29 Airplane. Report No. 2-a(11), USSBS Index Section 6
Analysis of B-29 operations, May 1945, Report No. 11-a(21), USSBS Index Section 6
Report on Japan's rubber processing facilities, 21 April 1943. Report No. 19-b(34), USSBS Index Section 6
Project No. (T-1) 36--6 June 1944--doctrine of employment of B-29 airplane. Report No. 2-a(19), USSBS Index Section 6
Project No. 50-9 (Army Air Force manual on B-29 aircraft). Report No. 2-a(60), USSBS Index Section 6
Project No. 4046C471.6--29 November 1944-- preliminary report on multiple suspensions of bombs in B-29 airplane. Report No. 2-a(34), USSBS Index Section 6
Project No. (M-1) 10d--23 July 1944--preliminary report of B-29 heat test (part of B-29 operational suitability test). Report No. 2-a(13), USSBS Index Section 6
Project No. 3864C452.1--4 January 1945-- operational suitability test of B-29 airplane. Report No. 2-a(2), USSBS Index Section 6
Project No. 3815C413.44--12 June 1945--test of chaff dispensation from B-29 airplane. Report No. 2-a(53), USSBS Index Section 6
Project No. 3590C452.12--30 September 1944-- snap opening door installations on B-29 airplane. Report No. 2-a(10), USSBS Index Section 6
Project No. 4017C452.1--23 May 1945--cold weather test of B-29 type aircraft. Report No. 2-a(52), USSBS Index Section 6
Project No. 3571C452.26--16 September 1944-- comparative test of B-29 with four-gun upper forward turret and B-29 with two-gun turrets. Report No. 2-a(9), USSBS Index Section 6
Report on Japanese files research project (special report and directory), 21 December 1944. Report No. 19-b(178), USSBS Index Section 6
Last Updated:
Uploaded: 2020-12-17