
BATTLE CRUISER "AMAGI" AND "AKAGI" Schedule of Weight (for Cost estimate)

WEIGHT OF STORE

Weight of Fittings

WEIGHT OF FITTINGS. (nagato)

"Nagato" Weight of Armour

METHOD OF CALCULATING WEIGHT
Schedule of Field Trips
Schedule of Restricted Concerns
Schedule of Field Trips

各部所掌搭載重量/Weight of Hull & Fittings 9.4.24/他重量比較表3件/WEIGHT BOOK OF BATTLE-SHIP “NAGATO”MONTHLY RETURN OF WEIGHT(No. 32)from August 28th, 1917 to March, 1920 KURE DOCK YARD

WEIGHT of A TORPEDO BOAT
The real weight of peace

profile showing Weight Curve of C.G

Comparison of Weight in Normal Condition

Comparison of Weight of Outside Plating of B.S. "Ise"

Estimated Weight and Position of Center of Gravity

LEGEND OF WEIGHT OF BATTLE SHIP “A110”1916.4.14

frames of “Kongo”“Fuso”/他2件

T.B.D. "MOMO" DISTRIBUTION OF WEIGHT. No.2

T.B.D. "MOMO" DISTRIBUTION OF WEIGHT. No.1

WEIGHT DISTRIBUTION OF T.B.D."AYANAMI." AS COMPLETED

Dia of shell & weight〔曲線図〕

T.B.D. "MOMO" DISTRIBUTION OF WEIGHT. No. 2
Schedule of Restricted Concerns (As of 30 September 1946)

METHOD OF CALCULATING WEIGHT

50,000T 30Knots

approximate distributional vertical weight of guns,□□□□tions etc

〔巡洋戦艦艦型検討メモ〕

〔各種砲塔図〕

〔諸艦起工・進水〕/〔佐々木中佐宛平賀照会状〕/〔長門改正案メモ〕/〔呉造船船渠メモ〕

〔八重山損傷の図〕

"Kasasagi" Ventilator at aft Boiler Room Scale 1/10

軍艦長門公試並関係作業実施予定表

〔軍艦八重船底にセメント塗布の図〕各日調

〔シャフトブラケット関係図〕

"Nagato" Weight of Armour

〔軍艦八重山船内ニ石炭・タンク・材木等填充の図〕 9月22日調

軍艦長門工事予定概括表(大正六年七月十八日調)

〔金剛代艦装甲検討用資料〕

Lusatania

弾丸対甲板効力関係一般 大正七年一月 金田大佐 〔他〕

さつま公試

Stress Hog Zag

軍艦赤城工程調査表 大正11年3月13日現在

〔諸艦舵形状図〕

〔書翰〕9年〔コピー〕 〔発〕平賀 譲 〔宛〕牧野 茂

〔61センチ水上・水中発射管図面〕

実用公式
Last Updated:
Uploaded: 2021-07-29
