Summary of control methods used. Report No. 40j(5), USSBS Index Section 2
USSBS summary. Report No. 39ee(5), USSBS Index Section 2
Report on electric power consumption control ordinance. Report No. 40j(3), USSBS Index Section 2
Maps used in compiling report. Report No. 40q(5), USSBS Index Section 2
Automobile Control Board. Report No. 39ddd(5), USSBS Index Section 2
USSBS-summary report. Report No. 39c(2), USSBS Index Section 2
Summary Report. Report No. 1, USSBS Index Section 2
Preliminary summary report and conclusions. Report No. 40a(5), USSBS Index Section 2
Electric Enterprise Law. Report No. 40j(4), USSBS Index Section 2
Electric Enterprise Law. Report No. 40j(4), USSBS Index Section 2
USSBS summary report. Report No. 39j(3), USSBS Index Section 2
Draft of summary of the industrial machinery control association. Report No. 39ii(1), USSBS Index Section 2
Summary of wartime shipping. Report No. 54ee(2), USSBS Index Section 2
Summary report-work sheets. Report No. 92c, USSBS Index Section 2
Summary of statistics. Report No. 92l(6), USSBS Index Section 2
Terms used in transmission of air-warnings defense. Report No. 10c(5), USSBS Index Section 2
Report on merits and demerits of 50 and 60 cycle system of control (part Japanese). Report No. 40j(7), USSBS Index Section 2
Report on merits and demerits of 50 and 60 cycle system of control (part Japanese). Report No. 40j(7), USSBS Index Section 2
Fire control center. Report No. 104h, USSBS Index Section 2
Summary of operations, 5 June-14 August 1945. Report No. 2-g(2), USSBS Index; Section 7
Vehicles used in terminal operation in Tokyo. Report No. 54z(5), USSBS Index Section 2
Summary report of Tokyo substations. Report No. 41ii(1), USSBS Index Section 2
Summary of captured vessel list. Report No. 54ww(2), USSBS Index Section 2
Complete set of drawings used in report. Report No. 15k, USSBS Index Section 2
最終更新日:
登録日: 2020-12-17